CMT: (Cut, Make, Trim): This type of garment manufacturing is perfect for when you know exactly how your clothes should look like. Meaning that you have figured out the design, sizes, grading, patterns, fabrics, dyeing, and printing. The only thing a clothing manufacturer does is – cut, make, and trim.
Ideally, a clothing factory providing this service should have automatic fabric cutters, experienced sewing and quality-control technicians. Learn more about one of these aspects on the fabric cutting page.
We need to have these details from you to make your CMT request:
- Full design specs including seam-to-seam measurements.
- Fabrics selection and grading
- Fabrics pattern(s)
- Stitching methods
- Haberdashery selection
- Printing methods (if needed)
- Embroidery methods (if needed)
- Packing methods
- ETD materials
- Sample making: 5 days
- Production: 20 - 30 days
CMPT (Cutting, Making, Packing, Thread): is also a type of garment manufacture when you only need those final steps of making a garment.
You also have to provide us with these details below and the cost is various depending on the styles:
- Full design specs including seam-to-seam measurements
- Fabrics selection and grading
- Fabrics pattern(s)
- Stitching methods
- Haberdashery selection
- Printing methods (if needed)
- Embroidery methods (if needed)
- Packing methods
- ETD materials
- ETD garment
Process | Lead time | |
---|---|---|
Period 1 | Step 1: Propose designs in 2D, 3D and materials lists. | 1 month |
Step 2: After approved step 1, make samples in similar material. | 7 days | |
Period 2 | Step 1: Procurement and development of materials at small quantity | 15 days |
Step 2: Make Pre-production samples. | 10 days | |
Period 3 | Step 1: Procurement and development of materials at bulk quantity | 20 days |
Step 2: Production - CMPT. (send in-production sample) | 20 days | |
Step 3: Delivery. | 10-45 days |
Process | Lead time |
---|---|
Step 1: Review Your Final Tech Pack. We would like to get your Techpack with a measurement chart for offering FOB quotation. In case you don't have techpack, please send us original sample for reference | 1 - 2 days |
Step 2: Making Your Physical Proto Sample, Fit Sample. | 4 days for reference fabric 15 days for correct fabric. |
Step 3: Submit Your Bulk Production Order Once the price and sample are approved and the PO is released, the invoice will be issued for 50% advantage, and the PPS will be submitted while materials are prepared for bulk production | 10 - 12 days |
Step 4: Receive Bulk Production. We can deliver (almost) anywhere in the world. We’ll issue an invoice for the balance of your order upon delivery, and a freight invoice after rates actualize. | 60 - 90 days after signing PO and receiving payment |